Motorized trolley type 3 ton electric chain hoist & 3 ton chain fall hoist, China supplier
3 ton Electric chain hoist for sale with motorized trolley used for monorail cranes. Check Weihua3 ton electric chain hoist & 3 ton chain fall hoist specifications now. Dongqi, your Chain fall hoist supplier...
Consult OnlineManual trolley chain hoist: 1, 1.5, 2, 3, 5, 10, 20 ton Electric chain hoist with manual trolley
Manual trolley chain hoist for sale. Dongqi Electric chain hoist with manual trolley type is with capacity of 1 ton, 1.5 ton, 2 ton, 3 ton,5 ton, 10 ton, 20 ton for sale at...
Consult Online15- 20 ton electric chain hoist
Electric chain hoist for sale. 15 – 20 ton electric chain hoist: Trolley electric chain hoist and Suspension electric chain hoist for sale good price. Check the specifications of the 10 -20 ton electric...
Consult Online2 ton low headroom electric chain hoist, Custom hoist design, Low hoist price
2 ton low headroom Electric chain hoist for sale. Weihua2 ton electric chain hoist with ultra low headroom design, electric / manual trolley for monorail cranes. Check Weihua2 ton low clearance hoisting equipment.QrPHenan Weihua...
Consult Online3 ton electric chain hoist with manual trolley, 3 ton hoist and chain hoist supplier
3 ton Manual trolley Electric chain hoist for sale. 3 ton electric chain hoist with manual trolley for monorail cranes. Types of manual trolleys selections for the chain hoists. Check 3 ton manual trolley...
Consult OnlineHook suspension 3 ton electric chain hoist for sale, 3 ton electric hoist specifications
3 ton Electric hoists for sale. Hook suspension type 3 ton Electric chain hoists for sale, best priced hoist. Check hoist specifications of 3 ton electric chain fall now.tvGHenan Weihua Machinery Co., Ltd Hook...
Consult Online
minimum distance between structure beam & overhead crane
How to Measure Span and Runway Length for an Overhead …
An overhead crane’s span is essentially its width across the bay—or the measured center-to-center distance between the runway beams. It’s important because it determines how much material is required to build the bridge girders and most significantly affects the cost of the overhead crane . Overhead Crane and Hoist Terminology
Boom (Overhead Crane): … The minimum horizontal distance between the center of the runway rail and the hook. Hook Height: … Supporting Structure (Jib Crane): For a free standing jib crane the supporting structure is the foundation which the crane is bolted to or implanted in. Crane Terminology – Overhead Bridge Crane Manufacturers
GAGE–- Horizontal distance between the centerlines of the rails that support the trolley on a double girder bridge. GANTRY CRANE – A crane similar to an overhead crane except that the bridge for carrying the trolley or trolleys is rigidly supported on two or more legs running on fixed rails or other runway. Important Crane Terminology to Know – Spanco
Gantry Crane: A gantry crane is a crane with a bridge beam supported on two or more legs that run parallel on fixed rails or a runway. Hoist: A hoist is a machinery unit that is used to lift and lower a load. Hook Approach: Hook approach is the minimum horizontal distance between the …
Glossary of Terms for Overhead Cranes End approach: The minimum horizontal distance, parallel to the runway, between the outermost extremities of the crane and the centerline of the hook. End tie: A structural member other than the end truck which connects the ends of the girders to maintain the squareness of the bridge. Bridge Crane Terminology — OverheadCraneConsulting A crane with a single or multiple girder movable bridge crane a movable or fixed hoisting mechanism and traveling on an overhead fixed runway structure. CRANE, POLAR/ASME B30.2. … The principal horizontal beam(s) of the crane, which supports the trolley, … The minimum horizontal distance between the center of the runway rail and the hook. Overhead crane terminology | Konecranes CLEARANCE: The minimum distance from any part of the crane to the point of nearest obstruction. COLLECTORS, CURRENT: Contacting devices for collecting current from runway or bridge conductors. CONDUCTORS, BRIDGE: The electrical conductors located along the bridge structure of a crane that transmit control signals and power to the trolley(s). INTRODUCTION to JIB CRANES – Gorbel Inc. crane (i.e. the distance between the two wall mounting points). Capacity: … structure is the overhead support the crane is mounted to. Thrust & Pull: Forces exerted by a crane on its supporting structure. … • Structural (I-beam) jib cranes are painted yellow. Crane Structure Service – Crane 1 Services As an example, a runway system can be designed to support a 10-ton crane along with two 5-ton cranes. Depending on the runway design, there may or may not be restrictions to the allowable distance between the loaded cranes.
European Double Girder Overhead Crane – FineWork Cranes
European double beam series bridge crane can effectively make use of factory space, and make the headroom lowest and the limit distance between hook and two sides walls minimum. European design concept reduces the weight of the whole crane, and can greatly save the cost of the plant. How to Measure Span and Runway Length for an Overhead …
An overhead crane’s span is essentially its width across the bay—or the measured center-to-center distance between the runway beams. It’s important because it determines how much material is required to build the bridge girders and most significantly affects the cost of the overhead crane . European Style Crane – Overhead crane, Gantry Crane …
European Double Girder Overhead Crane European double beam series bridge crane can effectively make use of factory space, and make the headroom lowest and the limit distance between hook and two sides walls minimum. Crane Terminology – Washington Crane
A type of crane or monorail suspension method used to support tracks from an overhead structure and fastened to the structure by means of pressure rather than welding or direct bolting. Clearance: Minimum distance from the physical boundaries of a crane to the nearest obstruction. Overhead crane, Gantry Crane, Electric hoist-Henan …
European Double Girder Overhead Crane European double beam series bridge crane can effectively make use of factory space, and make the headroom lowest and the limit distance between hook and two sides walls minimum.
Useful Crane Information – Wazee Crane Overhead Lifting … GIRDER: The principle horizontal beam of the crane bridge which supports the trolley and is supported by the end trucks. HOIST: A machinery unit that is used for lifting and lowering a load. HOLDING BRAKE: A brake that automatically prevents motion when power is off.The minimum horizontal distance between the center of the runway rail and the hook. Electric Overhead Traveling (EOT) Cranes and Hoists 5) Clear Span- Distance between columns across the width of the building. Building width is defined as the distance from outside of eave strut of one sidewall to outside of eave strut of the opposite sidewall. Crane Span is the horizontal center distance between the rails of the runway on which the crane … Overhead crane test questions and answers Traveling Bridge … The crane wheels are supported from the bottom of the flange of the crane beams which act as a crane rail and usually only span a portion of the column-to-column span of the structure. Under running, cranes are typically available in standard capacities up to 10 tons … Glossary of Crane Terminoloy – EMH, Inc. The minimum horizontal distance, parallel to the runway, between the outermost extremities of the crane and the centerline of the hook. End tie: A structural member other than the end truck which connects the ends fo the girders to maintain the squareness of the bridge. Endtruck: Advantages and Disadvantages of Single Overhead Bridge Cranes 5/6/2018 · Overhead cranes that operate with a minimum of two overhead runways built into a building’s support structure are more commonly referred to as “bridge” cranes. The bridge serves two purposes – first, it’s a load-bearing beam running the entire width of the work area and second, it’s the structure connecting the runways on which the hoist moves.
Crane and Derrick Safety I – Power Line Safety … ALWAYS, when using crane and/or equipment near energized power lines of 50,000 volts (50kV) or more, make sure the minimum distance between the lines and any part of the crane is 10 feet plus 4 inches for each 10kV more than 50kV.